Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 23 results ...

Ahmadian Fard Fini, A, Akbarnezhad, A, Rashidi, T H and Waller, S T (2018) Dynamic Programming Approach toward Optimization of Workforce Planning Decisions. Journal of Construction Engineering and Management, 144(02).

Chao, L and Kuo, C (2018) Neural-Network-Centered Approach to Determining Lower Limit of Combined Rate of Overheads and Markup. Journal of Construction Engineering and Management, 144(02).

Choi, B and Lee, S (2018) An Empirically Based Agent-Based Model of the Sociocognitive Process of Construction Workers’ Safety Behavior. Journal of Construction Engineering and Management, 144(02).

Du, J, Shi, Y, Zou, Z and Zhao, D (2018) CoVR: Cloud-Based Multiuser Virtual Reality Headset System for Project Communication of Remote Users. Journal of Construction Engineering and Management, 144(02).

El Meouche, R, Abunemeh, M, Hijaze, I, Mebarki, A and Shahrour, I (2018) Developing Optimal Paths for Evacuating Risky Construction Sites. Journal of Construction Engineering and Management, 144(02).

Fuller, J, Brown, C J and Crowley, R (2018) Performance-Based Maintenance Contracting in Florida: Evaluation by Surveys, Statistics, and Content Analysis. Journal of Construction Engineering and Management, 144(02).

Ghodoosi, F, Abu-Samra, S, Zeynalian, M and Zayed, T (2018) Maintenance Cost Optimization for Bridge Structures Using System Reliability Analysis and Genetic Algorithms. Journal of Construction Engineering and Management, 144(02).

Han, K, Degol, J and Golparvar-Fard, M (2018) Geometry- and Appearance-Based Reasoning of Construction Progress Monitoring. Journal of Construction Engineering and Management, 144(02).

Kaminsky, J A (2018) National Culture Shapes Private Investment in Transportation Infrastructure Projects around the Globe. Journal of Construction Engineering and Management, 144(02).

Khanzadi, M, Nasirzadeh, F and Dashti, M S (2018) Fuzzy Cognitive Map Approach to Analyze Causes of Change Orders in Construction Projects. Journal of Construction Engineering and Management, 144(02).

Langdon, R R and Sawang, S (2018) Construction Workers’ Well-Being: What Leads to Depression, Anxiety, and Stress?. Journal of Construction Engineering and Management, 144(02).

Lessing, J and Brege, S (2018) Industrialized Building Companies’ Business Models: Multiple Case Study of Swedish and North American Companies. Journal of Construction Engineering and Management, 144(02).

Love, P E D, Teo, P and Morrison, J (2018) Revisiting Quality Failure Costs in Construction. Journal of Construction Engineering and Management, 144(02).

Moon, S, Xu, S, Hou, L, Wu, C, Wang, X and Tam, V W Y (2018) RFID-Aided Tracking System to Improve Work Efficiency of Scaffold Supplier: Stock Management in Australasian Supply Chain. Journal of Construction Engineering and Management, 144(02).

Praticò, F G and Giunta, M (2018) Proposal of a Key Performance Indicator for Railway Track Based on LCC and RAMS Analyses. Journal of Construction Engineering and Management, 144(02).

Rashid, K M and Behzadan, A H (2018) Risk Behavior-Based Trajectory Prediction for Construction Site Safety Monitoring. Journal of Construction Engineering and Management, 144(02).

Said, H M and Bartusiak, J (2018) Regional Competition Analysis of Industrialized Homebuilding Industry. Journal of Construction Engineering and Management, 144(02).

Said, H M and Kandimalla, P (2018) Performance Measurement of Building Sheet-Metal Ductwork Prefabrication under Batch Production Settings. Journal of Construction Engineering and Management, 144(02).

Sangiorgio, V, Uva, G and Fatiguso, F (2018) Optimized AHP to Overcome Limits in Weight Calculation: Building Performance Application. Journal of Construction Engineering and Management, 144(02).

Stanford, M S and Molenaar, K R (2018) Influence of Simplified Procurement Methods on Competition for Public Sector Construction. Journal of Construction Engineering and Management, 144(02).

Tran, D Q, Diraviam, G and Minchin, R E (2018) Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types. Journal of Construction Engineering and Management, 144(02).

  • Type: Journal Article
  • Keywords: Delivery methods; Project types; Performance; Highways;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001437
  • Abstract:
    The design-build (D-B) project delivery method has been used increasingly by state departments of transportation (DOTs) because of its documented benefits. Many studies have shown the superior performance of D-B projects when compared to traditional design-bid-build (D-B-B) projects. However, these studies often rely on experts’ judgments or small sample sizes based on data collected from surveys, interviews, or case studies. There are few, if any, empirical studies that have compared D-B-B and D-B highway project performance by work types. This research analyzed 139 pairs of D-B-B and D-B highway projects built by the Florida DOT. The 139 pairs of projects were classified into five categories of work types: (1) new construction; (2) reconstruction; (3) resurfacing, restoration, rehabilitation (3R) projects; (4) intelligent transportation systems (ITS)–related projects; and (5) miscellaneous construction such as sidewalks, bike lanes, or landscaping. The study employed both parametric and nonparametric statistical tests to compare cost growth, schedule growth, and construction intensity metrics across the five project work types. The results show that D-B projects statistically perform better than D-B-B in terms of cost growth and schedule growth for miscellaneous construction and 3R project work types, respectively. Design-build projects also statistically provide a higher construction intensity (more work put in place) than D-B-B for new construction and reconstruction work types. No statistically significant differences between D-B-B and D-B projects were found for other project work types. This study contributes to the construction engineering and management body of knowledge by providing empirical comparisons between D-B-B and D-B project performance on the basis of different types of work. The findings from this paper may provide guidance for state DOTs and practitioners to select D-B project delivery for specific work types and benchmarks D-B against D-B-B.

Xiao, J, Li, X, Zhang, Z and Zhang, J (2018) Ontology-Based Knowledge Model to Support Construction Noise Control in China. Journal of Construction Engineering and Management, 144(02).

Yiu, T W, Liu, T and Kwok, L C (2018) Explicating the Role of Relationship in Construction Claim Negotiations. Journal of Construction Engineering and Management, 144(02).